Skilled Nursing Facility Receives
Full Scale Renovation

Large-scale, phased renovation completed over a 4-month per phase schedule, involving full mechanical & sprinkler systems replacement within an actively occupied healthcare environment while maintaining continuous operations and patient care.

Location: Wadesboro, NC
Sector: Healthcare
Services: Design Build / Renovation / Construction / Project Management / Coordination / Design Support
Environment: Occupied, Active Skilled Nursing Facility

Scope

Full-scale renovation of an approximately 35,000 SF skilled nursing facility, executed in phased wing sections of approximately 25 beds at a time, including complete interior demolition and replacement of mechanical, electrical, plumbing, and fire sprinkler systems as well as all interior finishes and furnishings.

Challenges & Constraints

  • Full gut renovation performed within an actively occupied skilled nursing facility

  • Coordination of complete sprinkler and HVAC system replacement without impacting adjacent patient care areas

  • Heavy construction activity occurring just feet away from occupied resident rooms

  • Strict life safety, and regulatory compliance requirements

  • Phased construction requiring coordination with reduced census and in-place resident relocations

  • Limited work access and need for precise scheduling to align with facility operations

Approach & Jobsite Controls

  • Executed controlled, wing-by-wing phasing (~25 beds per phase) to isolate construction zones

  • Coordinated with facility leadership who strategically reduced census and relocated residents in place

  • Implemented full containment systems, including sealed barriers and negative air pressure.

  • Carefully planned and executed sprinkler and HVAC tie-ins to maintain service to active care areas

  • Maintained continuous life safety compliance, including protected egress and fire protection coverage

  • Managed high-intensity construction in close proximity to occupied spaces with strict cleanliness and safety protocols

  • Provided consistent communication and coordination with facility staff and ownership throughout all phases

Results & Outcomes

  • Delivered major infrastructure improvements, replacing failing building systems with reliable, modernized MEP and fire protection systems

  • Successfully maintained ongoing facility operations and patient care throughout construction

  • Executed phased construction efficiently, maintaining schedule across the project through refined sequencing and coordination

  • Achieved final inspections with both local and state inspections

  • Significantly improved overall facility environment, with positive feedback from both staff and residents Enhanced long-term functionality, safety, and comfort of the building

Premier’s Impact

This project reflects Premier Design & Construction's belief that investing in critical infrastructure strengthens the safety, reliability, and long-term performance of the facilities our clients depend on. By combining healthcare operational knowledge with disciplined planning, technical expertise, and quality construction, our team delivered complex system improvements while minimizing disruption to residents, staff, and daily operations.